Omnitrans, Methane and Hydrogen Detection Replacement
Construction Management · CTO 04
Construction management for methane and hydrogen detection replacement at Omnitrans’ East Valley and West Valley maintenance facilities.
Ongoing
View gallery · 2 
- Client
- Omnitrans
- Contract
- MNT24-47
- Schedule
- CM scope proposed October 27, 2026
- Status
- Ongoing
- Locations
East Valley — 1700 West Fifth Street, San Bernardino, CA 92411
West Valley — 4748 Arrow Highway, Montclair, CA 91763
Project overview.
The East Valley and West Valley detection-system replacement project upgrades hazardous-gas monitoring and alarm systems serving Omnitrans’ transit maintenance facilities in San Bernardino and Montclair. The work coordinates methane, hydrogen and carbon monoxide detection with ventilation and exhaust interlocks, alarm annunciation, electrical shunt trips, fire-system interfaces and backup power, together with duct-shaft, roofing and interior-finish work at East Valley.
S Y Lee’s construction management scope covers owner and contractor coordination, RFI and submittal tracking, and technical coordination of detector locations, controls interfaces and electrical capacity. The scope also includes requested field observations, schedule and change review, and coordination of system testing, owner training and closeout documentation to support installation within active maintenance facilities.
Our role.
- Construction management
- Hazardous-gas system coordination
- Mechanical and electrical interface review
- RFI and submittal tracking
- Field and shutdown coordination
- Testing and closeout coordination
Project gallery
2 imagesLet’s bring it
all together.
Connect with our Glendale team to discuss your project and engineering needs.
Contact us
